STORAGE AND CONTINUITY

Resilience in reserve.

Storage is specified by duration and by the value of the interruption it prevents. A system sized for frequency response and one sized for overnight supply are different assets with different economics.

Capability

Resilience in reserve.

Duration and Sizing

Required duration and cycles established from the load and the failure it must cover.

Technology Selection

Chemistry and configuration chosen against duration, cycle life, temperature and site constraints.

Grid Services

Frequency, capacity and arbitrage revenue where market structures permit participation.

Continuity

Critical-load backup for facilities where interruption carries safety or commercial consequence.

Safety and Siting

Fire, thermal management and separation designed to the applicable standard and the local authority requirement.

What a credible project brief includes
  • Location and site control
  • Load or supply volume required
  • Grid or offtake position
  • Permitting status
  • Fuel or resource availability
  • Financing position
  • Required date
DISCLAIMER

Energy projects and supply are subject to technical feasibility, licences, permits, environmental requirements, sanctions, financing, contracting and market conditions. No project is represented as committed before formal approval.

Site, load, connection.

A project without those established is assessed as a concept.